March 2021

In March, the District awarded Hof Construction the contract for District wide security vestibules installation, with work set to begin at the conclusion of this school year.

The new security vestibules, which will be part of each school’s front entrance, will enhance the safety of the schools and be ready when students return for the 2021-2022 school year. Impacted schools include Becky-David Elementary, Castlio Elementary, Central Elementary, Harvest Ridge Elementary, Independence Elementary, John Weldon Elementary, Warren Elementary, Barnwell Middle School, Bryan Middle School, Francis Howell Middle School, Hollenbeck Middle School, Saeger Middle School and Francis Howell High School.  

Becky David After LightsBecky David Before Lights

During Spring Break, Prop S work began at Becky-David Elementary. The Facilities and Operations Department utilized this past week to get a jump start on renovation work to try to make up for the week lost due to weather earlier in the Spring. All classroom lights were updated to new LED fixtures and common areas such as the gyms and cafeteria were painted.

Over the summers of 2021 and 2022, Becky-David will have it’s electrical and HVAC systems updated, painting of the classrooms, new flooring, tuckpointing of the building, bathroom updates, parking lot repairs and updates plus much more.

Also in March, the City of St. Peters Planning and Zoning Commission approved site plans for the new Francis Howell North High School.

FHN Elevations

A traffic study at the campus was conducted this month to help ensure traffic runs smoothly both during construction and after the new high school opens.

Additionally, this month, geotechnical testing was conducted in the footprint of the new high school building. Using large drilling rigs, borings were drilled over 20 feet into the ground in order to collect soil samples. These samples help engineers understand the properties of the soil and groundwater beneath the new school, as these site characteristics impact building design.